Sunlight hits the panels

Photovoltaic (PV) cells absorb photons, knocking electrons loose and creating direct current (DC) electricity. Modern monocrystalline panels perform even on cloudy days.

Excess flows to the grid

When you produce more than you consume, the surplus is exported to the Ontario grid, spinning your meter backwards under net metering.

Inverter converts to AC

A microinverter or string inverter transforms DC into the alternating current (AC) your home uses, matching the utility's 240V standard.

You earn credits

The utility credits your account for every kilowatt-hour exported. Credits carry forward up to 12 months and offset nights, winters, and cloudy days.

Your home uses solar first

Solar-generated electricity powers whatever is running in your home in real time — appliances, lights, EV chargers, HVAC.

Optional battery storage

A home battery stores midday surplus for evenings and grid outages — turning your system into a resilient personal power plant.

Every component in a modern grid-tied system.

Solar Panels

Tier-1 monocrystalline modules, 400–450W each.

Bi-directional Meter

Installed by your utility to measure imports and exports.

Inverter / Microinverters

Enphase IQ8 microinverters or premium string inverters.

Monitoring Gateway

Real-time app on your phone — panel-level performance data.

Racking & Mounting

Aluminum rails with flashed roof attachments — leak-free for decades.

Optional Battery

Tesla Powerwall 3, Enphase IQ Battery, or Franklin aPower.

Production Meter

Tracks how much your system generates, separate from the utility meter.

Rapid Shutdown

Code-required safety device that de-energizes the array in an emergency.

From "yes" to producing power — typically 6 to 10 weeks.

Week 1

Site visit, design, and proposal

Week 4–6

Contract, permits, and utility application

Week 4–6

Equipment procurement and scheduling

Week 7

Installation (1–3 days on your roof)

Week 8–10

ESA inspection and utility grid connection

Frequently Asked Questions

Can't find what you're looking for? Our team is happy to walk you through the details.

Ready to power your next project?

Get a free, no-obligation estimate from Ontario's trusted electrical and solar experts.

bottom of page